The state of Kerala is highly inhabited and the entire state has to be treated as an extended metro city for all purposes of Transmission planning. An unprecedented rise in power demand, aging infrastructure and limited availability of resources has placed extraordinary pressure on utilities. The biggest challenge is to establish capacity augmentation in an economic manner within the shortest possible time and with minimum disruption. As a result, utility operators in Kerala faced a dilemma of whether to build new infrastructure or increase capacity of the existing electrical infrastructure. Sterlite Power's project delivery of upgradation of the existing 66 kV Malappuram - Manjeri single circuit line to a 110 kV double circuit using alternative construction techniques & latest technological innovations is nothing short of a case study. Watch the video for more.
To know more, please visit: http://bit.ly/2Wah9Ng